Elettronica Veneta
FA/EV
Aerobic Water Treatment Pilot Plant

The activated sludge pilot plant consists of an oxidation reactor, of a settler and of a final chlorination tank, according to the traditional diagram of single-stage sewage treatment process.

Description

Aerobic Water Treatment Pilot Plant

The activated sludge pilot plant consists of an oxidation reactor, of a settler and of a fi nal chlorination tank, according to the traditional diagram of single-stage sewage treatment process.

Biomass is oxidized in a reactor with agitator by the air blown by a compressor. The processed liquid is sent to the settler through an overfl ow.

The sludges settling on settler bottom are recycled by a recirculation pump into the oxidation tank. The water fl owing out of the settler is chlorinated and conveyed to a drain

Process control, data acquisition and supervision are automatically carried out by a microprocessor controller and by a specifi c control and supervision software (only for FAa/EV) that enables the remote control of various operational parameters.

Training Program

  • Purification effi ciency versus the following parameters:
      • composition of water to be treated
      • residence time
      • organic load
      • pH in oxidation tank
      • concentration of dissolved oxygen
  • Automatic PID control (only FAa/EV)
  • Plant supervision (only FAa/EV)

Supplied with Theoretical, Pratical, Experimental Handbook